
Aim for the middle of the piece of paper on the white square — this is the reference for the stack that goes here.

Two connectors inside stock room, on the right.

Three connectors on the white square from the reference shot, stacked one on top of another.

Last two here. Reinforce the wall first, then place them as framed.

Visual check on the holes, and where the deployable shield goes.